Veteran-Owned Small Business Certified Veteran-Owned Enterprise · Fort Worth, Texas
Direct Commercial Line: (817) 607-8873
Menu
Submit Commercial RFQ
Direct Line: (817) 607-8873
Subsurface Engineering Division

Foundation Drilling & Heavy Civil Engineering

Commercial foundation drilling, deep drilled pier shafts (24" to 96" diameter), reinforced rebar cages, and heavy concrete mat footings across Texas.

Subsurface Stability for High-Load Industrial Facilities

Heavy industrial infrastructure requires uncompromising foundation engineering. Whether anchoring 200-foot cement silo towers, high-vibration aggregate crushers, or multi-level automated vehicle parking structures, our foundation drilling crews drill and pour deep shafts seated into competent bedrock.

Our specialized drilling rigs are capable of penetrating dense Texas limestone, shale, and saturated water-table strata using temporary and permanent steel casing, high-viscosity drilling polymers, and high-strength self-consolidating concrete.

Technical Specifications & Engineering Standards

Engineering Parameter Standard Commercial Scope Heavy Industrial / Silo Scope
Shaft Diameter 24" – 48" Drilled Shafts 54" – 96" Mega-Diameter Shafts
Drilling Depths 20 – 60 Feet 60 – 120+ Feet into Competent Bedrock
Rebar Caging ASTM A615 Grade 60 tied cages Continuous spiral ties with ultrasonic test tubes
Casing Methods Open hole or short surface casing Full-depth telescopic vibratory steel casing
Concrete Strengths 4,000 – 5,000 PSI commercial mix 6,000 – 8,000 PSI high-early mass concrete
Junction Group Single-Source Delivery
By integrating engineering design, captive structural steel fabrication (Harbor Fab), deep civil drilling, and equipment erection, Junction Industries eliminates the traditional delays and cost overruns caused by fragmented subcontracting.

Execution Methodology

  • 1. Geotechnical Verification: Core drilling and soil stratigraphy review to establish exact bedrock bearing capacity.
  • 2. Rig Mobilization & Pier Drilling: Hydraulic rotary drill rigs turning augers and core barrels with slurry/casing as required.
  • 3. Rebar Cage Setting & Centralization: Crane rigging of full-depth reinforced steel cages with centralizers for proper cover.
  • 4. Concrete Tremie Pour & Integrity Testing: Continuous bottom-up tremie pour preventing voids, verified by Crosshole Sonic Logging (CSL).
Transmit Specifications for Estimating →